• Original wall was falling over due to lack of reinforcing and concrete fill causing a safety...
    30
    Original wall was falling over due to lack of reinforcing and concrete fill causing a safety hazard...
  • 225sqm exposed finish driveway with sea shells thrown over in adding a fitting decorative touch...
    50
    225sqm exposed finish driveway with sea shells thrown over in adding a fitting decorative touch to...
  • Stables foundations all complete and ready for @woodsmen.nz to finish the build
    30
    Stables foundations all complete and ready for @woodsmen.nz to finish the build
  • With more weather events coming through more retaining walls are failing! This wall has now...
    40
    With more weather events coming through more retaining walls are failing! This wall has now...
  • New stables for @woodsmen.nz
    60
    New stables for @woodsmen.nz
  • New 110m2 driveway. The existing driveway was incorrectly prepped and poured. Pick who you use...
    50
    New 110m2 driveway. The existing driveway was incorrectly prepped and poured. Pick who you use...
  • Massive effort from the team to deliver a 1500sqm asphalt car park. Long days and some night...
    50
    Massive effort from the team to deliver a 1500sqm asphalt car park. Long days and some night shifts...
  • The team getting that quality finish as always 🤌
    90
    The team getting that quality finish as always 🤌
  • Small drainage job to remove the surface water off the back lawn.
    10
    Small drainage job to remove the surface water off the back lawn.
  • When the customer sends through drone photos 🤌 driveway extension looking sharp from above.
    00
    When the customer sends through drone photos 🤌 driveway extension looking sharp from above.
  • Easy job to kick start 2026. 4kg black oxide acid etched finish.
    90
    Easy job to kick start 2026. 4kg black oxide acid etched finish.
  • This job wraps up our 2025 season. We’re incredibly grateful to everyone who supported,...
    80
    This job wraps up our 2025 season. We’re incredibly grateful to everyone who supported,...
  • 5 driveways patios and pathways prepped and poured. Driveways: 5kg black oxide exposed finish...
    40
    5 driveways patios and pathways prepped and poured. Driveways: 5kg black oxide exposed finish...
  • Consistency is key in the concrete world. That’s why Project Earthworks add our oxide on-site,...
    30
    Consistency is key in the concrete world. That’s why Project Earthworks add our oxide on-site,...
  • We’re proud to create results our clients notice — and feel. Thank you for trusting Project...
    80
    We’re proud to create results our clients notice — and feel. Thank you for trusting Project...
  • With the weather starting to warm up now is a good time to start planning your pond clean...
    110
    With the weather starting to warm up now is a good time to start planning your pond clean...
  • Added caravan and boat parking for @nationalministorage
    70
    Added caravan and boat parking for @nationalministorage
  • New path done ✅ matching the house with aged red bricks and antique cream mortar 🧱
    70
    New path done ✅ matching the house with aged red bricks and antique cream mortar 🧱
  • Commercial apron designed to take heavy weights daily.
    100
    Commercial apron designed to take heavy weights daily.
  • Stage 2 done. Acid etch finish with 6kg black oxide
    100
    Stage 2 done. Acid etch finish with 6kg black oxide