• 11/06/2020 - Clearing access to Canoe egress point at Teston Lock
    3 0
    11/06/2020 - Clearing access to Canoe egress point at Teston Lock
  • Open for business
    5 0
    Open for business
  • 01/06/2020 - Silt removal at Sluice Weir Lock
    3 0
    01/06/2020 - Silt removal at Sluice Weir Lock
  • 1 0
  • 05/05/2020 - Silt removal at Tonbridge Town Lock
    3 0
    05/05/2020 - Silt removal at Tonbridge Town Lock
  • 29/04/2020 - Dredging Eldridge’s Lock
    3 0
    29/04/2020 - Dredging Eldridge’s Lock
  • 22/04/2020 - Upstream landing stage at Teston Lock repaired
    2 0
    22/04/2020 - Upstream landing stage at Teston Lock repaired
  • 3 0
  • 0 0
  • 1 0