38
1
You can tell @vellacontracting was on this one. The finish work at the Scarborough Site is all...
43
1
You know when @vellacontracting is on site we're getting somewhere. Cabinets and trim are underway...
20
0
We took out the old masonry walls running from the front to the house and put the load on a new...
41
1
Steel's in. The structural beams are set in the Oakwood basement. Dusty work, lot of hands, lots of...
39
4
Oakwood is back to the bones. Demo's done. Behind the plaster we found old mechanical, old...
34
1
Hunt Club, before and underway. The house already had presence. Our job is making the entry match...
42
0
New project in Hunt Club. Sam barely got the intro out before the demo started. Front entry's down,...
63
5
Before the walls go up, we can scan the whole house. A full capture of every pipe, wire, stud, and...
39
2
Restructure day on the fire restoration job. No shortcuts in the framing. Each piece checked,...
48
1
Demo's done. Last screws out, last nails pulled. Before anything goes back in, the matrix gets...
20
0
We asked if you could spot the issues. Here's what we found. This fire restoration looked clean on...
18
0
Not every build starts from scratch. Sometimes we walk onto a site and know immediately — this...
57
2
Scarborough Site Update — Part 2. Temp stairs are out. Sturdy oak is in. Custom railings and...
40
5
Scarborough Site Update — Part 1. Worked through snow. Worked through rain. Kept moving. All...
32
2
Beaches site update. Roof on. Sheathing done. Electrical and HVAC underway. Helical piles...
44
0
The right team doesn't happen by accident. Every trade on a BreenSteed build is hand-picked,...